Apartment Complex Wall Restoration.
On this project, we traveled down to Bellevue where we removed the decaying timber walls and replaced them with Vertica Pro SRW wall block; tore out the old concrete steps; rebuilt the sump pump pit and built a fence around the upper-wall portion. Along the narrow side, we chose to remove the broken concrete and install a paver patio to provide a long lasting, beautiful, timeless solution.








